Tennant Carpentry & Building
Looking down from the scaffold onto a newly framed first floor: rows of treated timber joists with solid strutting between them, an opening trimmed out at one end, and the brick chimney rising through the middle.

Cuckfield · 2020

First-floor timber extension, Cuckfield

A first floor framed in timber over an existing single-storey structure, built around a chimney and a roof that stayed.

Town
Cuckfield

A first floor framed in timber over an existing single-storey structure, carried out for a trade client and finished as the last job of 2020.

Roof off

At the earlier stage the roof over this half of the house is gone and the floor below is open to the scaffold. The scaffold carries its own roof — sheeting over a curved frame, boarded lifts the whole way round — so the house stays covered while it is open.

The chimney stack stays where it is. New blockwork runs up around the perimeter, with steel set over the openings. A further beam lies on the deck with two material lifts stood beside it, ready to go up. To the right the retained half of the house is untouched: tiled roof, dormer, brick and block below. The new work has to meet that.

The deck

The second photograph is taken from the same lift of scaffold, later, after dark under the site lights.

Treated softwood joists run in three bays, each squared off its own bearing. Solid strutting is fitted in lines between them. The joists land on steel along one edge and on timber plate elsewhere, and the framing is cut around the chimney rather than the chimney being cut around it.

One bay is trimmed out for an opening. The short joists stop at a trimmer and the trimmer carries them back to the full joists either side. A sheet of ply is laid across the deck. None of that detail shows once the floor is boarded.

Meeting the existing building

Three sides of this floor land on something that was already there — a chimney that stays, a roof that stays, a wall that stays. Those junctions are set out on site, off the building as it measures, not as the drawing says it should be.

How it went in

01

Roof off

The roof over this half of the house came off under a scaffold carrying its own sheeted roof, so the building stayed covered the whole time it was open. The chimney stayed where it was, which means everything built above this point had to be set out around it rather than through it.

Looking down from a sheeted scaffold onto a house with the roof taken off over one half, new blockwork run round the perimeter with steel set over the openings, a brick chimney standing in the middle and two material lifts stood on the exposed floor below.
The roof off, the chimney left standing
02

The new roof frame

Rafters run down to a wall plate and up to a ridge that stops at the chimney, with a hip worked in at the far end. Three sides of this frame land on something that was already there, so the cuts are set out on site off the building as it measures rather than off the drawing.

New timber rafters running down from a ridge over an open floor, seen from a lift of scaffold, with the brick chimney and the retained tiled roof to the right.
Rafters going up, seen from the scaffold
Looking down from the scaffold at both slopes of a new roof framed in timber, the rafters running to a ridge that closes on the brick chimney, with the boarded floor visible between them.
Both slopes framed, ridge closing on the stack
The new roof structure seen from inside, rafters rising to a ridge with a hip at the far end, the brick chimney standing to one side, and timber sole plates laid out on the boarded floor.
Sole plates set out on the deck
03

The dormer framed

The dormer is framed inside the roof slope, with its own small pitched roof, rather than sat on top of it. Rafters cut away for an opening have to be carried on trimmers either side, so that framing goes in while everything is still open and reachable.

A dormer framed in bare timber studwork within new rafters, its cheeks, front and small pitched roof all visible, lit by work lights against dark scaffold sheeting overhead.
The dormer framed within the roof slope
04

Studding the gables

Both gable ends are studded out in timber and boarded, each with a steel set over its window opening. The studs above the opening land on the steel and the ones below land on the sill, so every part of the wall has somewhere to carry to.

The inside of a gable end studded out in timber and boarded, with a steel over a wide window opening and the new rafters running away to the left.
A steel over the wide gable opening
The inside of the framed roof looking at the far gable, studded and boarded, with a smaller window opening trimmed out under a steel and rafters rising to the ridge either side.
The other gable, its opening trimmed out
05

Lined out, and the stair

By this stage the dormer cheeks and the wall below them are boarded and the floor is covered, with a flight of stairs standing beside the opening. A dormer only reads straight once it is lined, so the framing behind those boards has to be true before any of them go on.

A dormer opening seen from inside with its cheeks and the wall below boarded out, rafters running away either side, and a flight of stairs standing to the left.
The dormer lined, a stair flight alongside

Next step

Tell Tom about the job.

Every enquiry is read by Tom. A survey and a written quotation come before anything is cut.

Start a conversation 07469 820977

Selected work

Lately, in Sussex houses.

Follow the work as it happens on Facebook