A long single-storey outbuilding with a garage door, finished: the whole roof re-tiled in its original plain clay tiles, white fascias and a brick gable end, under a clear blue sky.

Billingshurst · 2022

Roof renovation, Billingshurst

A trussed roof in Billingshurst that had moved for want of any bracing, pushing its brick gable 150mm out of plumb, taken apart and put back with the original tiles.

A roof renovation in Billingshurst, finished in June 2022. The client called because he was worried about the roof. It was leaning to one side, and it had pushed the brick gable wall with it — 150mm out of plumb by the time anyone looked at it properly.

The cause was found once the covering came off. The trussed roof had no cross member and no bracing between the trusses at all, so there was nothing tying one truss to the next and nothing to stop the whole run leaning together. What a trussed roof needs to be braced for is the general case; this building is what it looks like when it is missing.

The scaffold was structure, not access

The first thing on site held the building up.

Scaffold usually exists so people can reach the work. Here it went up to carry the roof and the leaning gable before anything was touched, because the two faults were holding each other in a bad equilibrium: the roof was pushing the gable out, and the gable was one of the things stopping the roof going any further.

That is worth understanding before the cost of a job like this looks strange. The scaffold is not an overhead on the repair. It is the first structural element of it, and until it is in, nothing can safely come off.

It had to come apart in one order and no other

Once the roof was held, the sequence was fixed by what was in the way.

The tiles, felt and battens came off first, which took the weight off the trusses and made them light enough to move. The brick gables came down next — not because they were beyond saving on their own, but because a wall that has been pushed 150mm cannot be pushed back, and it was in the way of the roof returning. Only then could the trusses be pulled back to where they were set out to be, and only once they were back could the bracing go in, because bracing a roof in the wrong position simply fixes it there.

That order is the owner’s. The reasons given for it here are read off the sequence and the photographs rather than quoted from him, and an audit was right to say the rest of this page is more careful about that distinction than these three paragraphs were.

Then the same order in reverse: gables rebuilt, in stud on the brickwork that stayed and clad in stained softwood; felt and battens back on; and the roof tiled again with the tiles that came off it.

That last part is why the finished photographs look like nothing happened. A roof relaid in its own tiles does not announce itself from the drive, which on a repair is the right outcome — the building is meant to look like it did before it started moving, not like it has been replaced.

How it went in

01

Scaffold first, before anything came off

November 2021. The scaffold is not access here: it was put up to hold the roof and the leaning gable while the cause was still in place.

Scaffolding erected the full length of a single-storey brick and tile outbuilding on a damp autumn morning, with fallen leaves on the grass and traffic cones at the base of the standards.
Put up to hold, not to climb
02

Stripped, and what was under it

April 2022, under a temporary roof. Tiles, felt and battens off, and the eaves opened up along the run.

A roof slope part stripped under a temporary scaffold roof: tiles and battens lifted off in bands, debris and old mortar on the remaining courses, and a boarded scaffold lift running along the brick wall below.
Under a temporary roof
A close view of the opened eaves: old tiles stacked on edge, felt torn back, and weathered rafter and batten ends exposed behind a downpipe, with scaffold and sheeting beyond.
The eaves opened up
03

The trusses, with nothing holding them together

The roof seen along its length once the covering was off. What is not in these photographs is the point of them: no cross member and no bracing between the trusses.

The full length of a trussed roof exposed under a scaffold roof, insulation between the ceiling ties, the tiles stacked in rows on the scaffold boards to the left, and a bare brick gable at the far end.
The whole run, uncovered
Looking along the underside of the trussed roof from the eaves: repeated timber trusses with punched metal plates at the joints, mineral wool insulation laid between the ceiling ties and boarding beneath.
Truss after truss, unbraced
04

The brick gable down

The gable that had been pushed out taken down to the wall below, so the roof could be pulled back to where it should have been.

A brick gable wall part demolished from the top down, with the stripped roof slope to the left, the trusses visible through the gap and bricks and rubble on the scaffold boards below.
Taken down to let the roof move
05

Rebuilt in stud

The new gable framed in stud on the brickwork that stayed, with the roof now braced behind it.

A new timber stud gable built off the remaining brickwork, studs at regular centres with a sole plate and head binder, mineral wool insulation visible between them and the braced trusses beyond.
Stud on the brick that stayed
06

Finished

June 2022. The gables clad in stained softwood, and the roof felted, battened and laid again with the tiles that came off it.

A long single-storey outbuilding with a garage door, finished: the whole roof re-tiled in its original plain clay tiles, white fascias and a brick gable end, under a clear blue sky.
The whole building, finished
The finished gable: horizontal stained softwood cladding in dark brown filling the triangle above the brickwork, white bargeboards and fascia, and the re-laid clay tiles running down the slope beside it.
Stained softwood on the new gable
The ridge of the finished roof against blue sky and trees: the original plain clay tiles relaid in courses with mortared ridge tiles along the top and a black gutter at the eaves.
The tiles that came off it

Next step

Tell Tom about the job.

Every enquiry is read by Tom. A survey and a written quotation come before anything is cut.