Inside the finished roof space: a painted steel frame standing clear of the slopes, timber joists spanning between the steels, a boarded floor, studwork dwarf walls along each side and a rooflight in the slope.

Bolney · 2021

A room in a hand cut roof, Bolney

A roof cut on site at Bolney in June 2021 and framed from the start to hold a room in the space beneath it, photographed through to August as that room took shape.

Town
Bolney

A room in the roof of a house at Bolney, West Sussex, made inside a frame that was cut on site in the summer of 2021 and set out from the start to hold it. The photographs run from 26 June, when it stood in bare timber, to 2 August, when the space beneath it had a floor, a steel frame, dwarf walls and a rooflight.

A roof that has to stay empty

A roof only has to do one job. This one had to do it while leaving the space underneath usable, and those two requirements pull hard against each other.

The ordinary way to hold a cut roof steady is to brace it internally, and all of that bracing lives in the middle of the roof space — which is precisely where a room has to go. Put a room in and most of it cannot stay.

So the load goes somewhere else. The painted steel frame standing in these photographs is what replaces it: posts and beams taking the roof at a height that clears head height, so the slopes above are held without the space between them being braced across. The timber joists span between the steels rather than between the walls.

That is the whole trade of a room in a roof. You are buying clear space, and you pay for it in steel.

A floor before it is a ceiling

The boards went down early, before the walls that make the room existed.

That order is not tidiness. What is under those boards is a floor, not a ceiling — it has to carry people, furniture and everything that gets walked in, rather than just holding plasterboard up from below. That is a different specification from a ceiling, and it is decided before a single board goes down.

Doing it first also gives everything afterwards something safe to stand on, which in a roof space is not a small thing. Every photograph after 3 July is taken from that floor.

Where the dwarf walls land

The studwork running along each slope is the last decision that changes how big the room feels.

A dwarf wall is where the sloping ceiling stops and a vertical one starts. Put it low and the room gets wider, but the useful part of the extra width is a wedge nobody can stand in. Put it high and the room is smaller and squarer, and the space behind the wall becomes storage reached through a hatch instead of floor you walk on.

There is no correct answer to that, only a chosen one, and it is chosen on site with the roof open and the floor down. Which way it went here is not something the photographs settle.

How it went in

01

The roof, cut

26 June. Rafters, hips and purlins cut on site and standing on the new blockwork, alongside the older tiled roof that stayed.

The hand cut roof frame from the scaffold, a hipped end with hip rafters running down to the corners and jack rafters filling in either side, bolted at the purlin junctions.
Cut and standing, before anything went in it
Along the length of the new roof frame from the scaffold boards, rafters running to the ridge with purlins beneath them, the walls still open below.
Along the frame from the scaffold
The new roof frame photographed beside the older clay tiled roof it was built alongside, with the scaffold and its sheeting behind.
New frame, older tiles alongside
02

Floored, and framed in steel

3 July. A boarded floor down over the joists and a painted steel frame standing in the space, holding the roof without filling the room.

Inside the roof with the floor boarded out, steel posts and beams standing in the space, timber joists spanning between them and the roof slopes lined behind.
A floor first, then the frame
03

A room in the roof

2 August. Dwarf walls studded along each slope, a rooflight in, and plasterboard on the floor waiting to go up.

The room in the roof taking shape: dwarf walls studded along both slopes, a rooflight in one of them, the steel frame overhead and plasterboard stacked on the boarded floor.
Dwarf walls in, rooflight in, ready to board

Next step

Tell Tom about the job.

Every enquiry is read by Tom. A survey and a written quotation come before anything is cut.