Tennant Carpentry & Building
A finished oak framed entrance porch: two posts on brick piers carrying a beam, curved braces springing into it, a gable truss above with a king post and raking struts, roofed in plain clay tiles, over a pale green boarded front door with a lantern each side.

Bolney · 2024

Oak framed porch, Bolney

An oak frame cut with pegged mortise and tenon joints from air dried oak, raised on brick piers and roofed in plain clay tiles.

Town
Bolney

An oak framed entrance porch in Bolney, West Sussex, built the way an oak frame has always been built: the joints cut into the timber, dry-assembled on the floor to prove them, then raised and pegged. Air dried oak throughout, roofed in plain clay tiles to match the house.

Base and approach

Each post lands on a brick pier rather than on the paving. The piers are built in brick matched to the house and capped with a bullnose course, and the dwarf walls between them return to the wall of the house.

Two steps of stone paving with a brick riser bring the ground up to the threshold, off the gravel. A lantern is fixed to the brickwork each side of the door.

Where it meets the existing roof

The pitch is carried up into the main roof slope, so the two roofs run into each other at a valley on each side rather than stopping dead at an abutment. The eaves line of the porch picks up the eaves line of the house on the right-hand side. The existing black half-round gutter and round downpipe stay where they were, running past the left-hand post.

How it went in

01

The truss, cut and assembled

The gable truss was cut and put together flat before anything was raised: tie beam along the bottom, principal rafters up to the apex, a king post between them and a pair of curved braces springing off it. Assembling it on the deck is how the joints get checked while they can still be adjusted — a mortise that is tight forty feet up is a different problem entirely.

An oak gable truss assembled flat on a floor against a brick wall: a tie beam along the bottom, principal rafters rising to the apex, a king post between them and curved braces springing from the post into each rafter.
02

The frame, dry-assembled

Then the frame that carries it. Two posts, a beam across their heads, and a curved brace let into each junction — dry-assembled on the floor first, without pegs, so every joint can be pulled apart again. The braces are cut from single pieces with the curve worked into the grain rather than bent or laminated.

An oak post-and-beam frame dry-assembled on a concrete floor inside a building under construction: two upright posts, a beam across their heads and a curved brace let into each junction, with shavings on the floor around it.
03

Raised

Up on the brickwork, with the truss sitting on the beam and the common rafters going on either side. The frame is pegged at this point — oak pegs driven through the mortise and tenon joints, which is what holds it together. There are no bolts and no straps in the frame.

The oak porch frame raised into position and seen from a scaffold: the gable truss standing on the beam with softwood common rafters being fixed either side, the tiled roof of the house behind and clay tiles stacked ready on the scaffold boards.
04

The joint at the post head

The junction that does the work. The brace runs from the post into the beam, and the tenon on each member is pegged through — the pegs read as small end-grain circles on the face. Cut this joint tight and the frame is stiff; cut it loose and no amount of ironmongery afterwards will make it so.

Looking up at the head of an oak post where a curved brace and the beam meet, the pegs through each mortise and tenon joint showing as small circles of end grain on the face of the timber, with scaffolding and sky behind.
05

Rafters and tiles

The porch roof is pitched to run back into the existing slope rather than stop against it, so the rafters are cut to die into the house roof and the covering carries across the junction. The plain clay tiles are the same tile as the house, stacked ready on the boards.

The porch rafters fixed and ready for tiling, seen along the scaffold: the oak frame below, softwood rafters above it running back into the main roof slope of the house, and bundles of plain clay tiles stacked along the boards.
06

Finished

Roofed, and the oak left bare to weather. It has already begun to silver on the faces that take the rain, and there is tannin streaking below the joints, which is what oak does outside and is not a fault. Shakes have opened along the grain of the posts as the timber has moved.

The completed oak framed porch: posts on brick piers carrying a beam with curved braces, the gable truss above roofed in plain clay tiles running into the house roof, a pale green boarded front door beneath and a black lantern on each pier.

Next step

Tell Tom about the job.

Every enquiry is read by Tom. A survey and a written quotation come before anything is cut.

Start a conversation 07469 820977

Selected work

Lately, in Sussex houses.

Follow the work as it happens on Facebook